Using Design Phase in Your Revit Project
Using Design Phase in Your Revit Project
by
Understanding How Design Phase Works
Let us open a project. You can use any project or simply create a new one. Just place a wall and select it.In instance properties, you will see phasing category. There are two parameters here: phase created and phase demolished.
By default, Revit has two phases: existing and new construction. New construction will be used as default, your newly created building elements will be in this phase. If you are working on renovation project or building expansion project, you can change the element phase to previous phase: existing. If there are any building elements you need to demolish, you can define when the element should be demolished.
Let us try a simple case, we want to demolish the wall (1) for building extension. I changed the phase created to existing, and change the phase demolished to none. To close the existing area, I created a temporary wall (2). This wall is created during building extension project, and also will be demolished in this phase. So I change the phase created to new construction, and phase demolished to new construction as well. See how they are represented differently.
Let us see another sample. This door below is created on new construction, while the wall created in existing. Revit will automatically tell us the wall need to be demolished to place the door. The wall in the door location is not removed like usual, but shown in dashed lines.
Managing Phases
We can rename, add, remove and arrange the phases sequence in phasing dialog box. You can access it from Revit ribbon, manage tab, phasing panel. Click phases button.There are three tabs in this dialog box. In project phases, you can manage the phases.
Phase Filters
In phase filters tab, you can manage how to show your objects. For example, show demo + new filter will only show all objects that demolished and objects that are created in new phases.You can use the filters in properties palette (or in view properties dialog box for pre-2011).
Try to play with this filter. And don’t forget, schedules are views too. So you can separate how many walls need to be demolished, and how many walls need to be built, separate from existing walls! Isn’t that cool?